A Post from Kevin on His (Unintentional) Day Off!

Okay, I've been at it for almost 10 days.

This all came about REALLY fast. Not the wanting to build a balloon, but the actually building of the balloon. I was planning to figure out how to string out the building over about 3 or 4 months in Ohio. With basically none of my own equipment, it was going to be tedious and involve a lot of borrowing and favors...then Dan re-iterated a previous offer to let me use his shop for the month.

I instantly switched into high stakes, stay up all night-balloon-planning/material-ordering mode. 5 days later, I was on a plane, out of the sunny south to the snow-laden NorthEast.

With lots of cautions from my parents, not to get in a hurry and be reckless, and with the overly-benign, and encouraging, support, advice, and help of Dan, I have spent most of the last 10 days, cutting and sewing, ordering and planning towards the completion of my balloon by the end of the month. With a few (small according to Dan) blunders in my material ordering, I am feeling quite confident that I will leave Amherst with a completed, 58,000 cubic foot balloon envelope!

The cuttoff is the beginning of February when I trek back to Ohio with a pit-stop at the conference for the Pennsylvania Association of Sustainable Agriculture. I plan to make this trip lugging 95 pounds worth of nylon fabric, cables and webbing!

Excited that I have nearly 100 percent of my own balloon in twelve garbage bags containing 60 foot long strips? EXTREMELY!

At the beginning of February, I will have an envelope, which still leaves the logistics of a bottom end and the FAA paperwork and inspection to figure out. With a budget that is whittling down, it will probably be in my best interest to wait through a few more months of winter and exploring options before I nail down a bottom end for my system. I'm in the market for tanks and a burner and probably will purchase a Boland collapsable basket within a year.

It will be hard to wait to start flying again, but the winter in Ohio isn't ideal anyway. I'm also on the lookout for an Amateur Built DAR, apparently, a new designation of DAR that can examine my work so I don't have to wait 6 months for the FAA!

Thanks for your interest.